AMS Go
Free template · Testing duties

Inspection report for site distribution boards – template (PDF & Excel) with RCD test list

Inspection report for site distribution boards with twelve visual inspection points, a table of measured values per circuit and residual current device, result and next dates – plus a list for the daily RCD test with the test button and an Excel register that shows inspections due.

As of PDF and ExcelAMS Go editorial team

Free: sign up for the newsletter once and all templates are unlocked in this browser. You can unsubscribe at any time.

Site distribution boards (Baustromverteiler) stand in the rain, are moved around and are used by many trades. You cannot tell by looking whether the residual current device (RCD) will switch off in an emergency. The implementation instruction on the German DGUV Regulation 3 and DGUV Information 203-006 therefore state short intervals for installations on construction and assembly sites: operate the test button every working day, test the effectiveness of the protective measure with a test instrument at least once a month and test the installation after every erection.

This inspection report for site distribution boards covers all three cases: one sheet for visual inspection, testing and measuring by the qualified electrician, a list for the daily test by instructed users and an Excel register for all boards. The template does not specify limit values – the qualified electrician assesses the measured values according to the electrotechnical rules.

What the template contains

  • Landscape PDF: header with distribution board, system type, supply, reason for inspection, test instrument and inspecting person
  • Twelve visual inspection points rated “OK”, “Defect” or “N/A”
  • Table of measured values per circuit: RCD, test button, tripping current, tripping time, touch voltage, protective conductor, insulation, loop impedance or earth resistance
  • Second page: monthly list for the daily RCD test with the test button and visual check
  • Excel register of all site distribution boards with calculated date of the next RCD test and status “Up to date”, “Due within 7 days” or “Overdue”

How to use the template

  1. 1

    Have it tested after setting up

    Have the installation tested by a qualified electrician after erection and the result recorded in the report. Enter every distribution board with number and location in the Excel register and set the inspection intervals in the risk assessment.

  2. 2

    Operate the test button every working day

    Instruct the users and put up the list from page 2 at the distribution board. Before work starts, the test button is pressed, the RCD is switched on again and the test is initialled. If the RCD does not trip, the board stays out of use until the qualified electrician releases it.

  3. 3

    Measure monthly and track dates

    At least once a month, a qualified electrician or an electrically instructed person with a suitable test instrument tests the effectiveness of the protective measure and enters the measured values. Once you have entered the date, the Excel register shows when the next test is due.

Inspection register in AMS GoRecord site distribution boards with inspection interval, file inspection reports directly with the work equipment, get reminded of inspections due in good time and pass defects to the action plan as actions.

Legal basis

  • Section 5 (1) DGUV Regulation 3: inspection of electrical installations and equipment before first use, after modification or repair and at certain intervals
  • Implementation instruction on Section 5 DGUV Regulation 3, Table 1A: protective measures with residual current devices in non-stationary installations monthly for effectiveness; residual current circuit breakers in non-stationary installations every working day by the users operating the test device
  • Implementation instruction on Section 5 DGUV Regulation 3, Table 1B: portable electrical equipment – guide value six months, on construction sites three months
  • DGUV Information 203-006 “Selection and operation of electrical installations and equipment on construction and assembly sites” No. 4.3 and 5.2: requirements for site distribution boards and protection of socket circuits
  • DGUV Information 203-006 No. 7.1 and 7.2: proven inspection intervals and proof of inspection
  • Section 14 Ordinance on Industrial Safety and Health (BetrSichV): inspection by a person qualified to carry out inspections, intervals from the risk assessment, recording of the results

Frequently asked questions

How often does the residual current device (RCD) on a site distribution board have to be tested?

Two tests belong together. Every working day the test device is operated, i.e. the test button is pressed; instructed users may do this, ideally before work starts. In addition, the protective measure is tested for effectiveness at least once a month – by a qualified electrician or, with suitable measuring and test instruments, by an electrically instructed person. This is what Table 1A of the implementation instruction on Section 5 DGUV Regulation 3 states for non-stationary installations, as does No. 7.1 of DGUV Information 203-006.

Who may inspect a site distribution board?

Instructed users may operate the test button. For all other tests, responsibility lies with a qualified electrician; if suitable measuring and test instruments are available, electrically instructed persons may also test under the direction and supervision of a qualified electrician (implementation instruction on Section 5 DGUV Regulation 3). Under Section 14 BetrSichV the inspecting person must be qualified to carry out inspections. Repair and maintenance are reserved for qualified electricians (DGUV Information 203-006 No. 7).

Which inspection interval applies to the site distribution board itself?

The employer sets the inspection intervals in the risk assessment. As guidance, the implementation instruction on DGUV Regulation 3 states one year in Table 1A for electrical installations and stationary equipment in operating premises, rooms and installations of a special kind (DIN VDE 0100 Group 700). According to DGUV Information 203-006, mobile distribution boards with RCDs and PRCD-S count as portable equipment, for which a guide value of three months applies on construction and assembly sites. Irrespective of this, the installation is tested after every erection, and the RCD tests continue monthly and every working day.

You may use and adapt the template freely in your own company and for your own clients. It reflects the regulations named as they stand.

Never search a spreadsheet for a deadline again

In AMS Go, what this template covers lives in one system with reminders, history and records at the push of a button – mobile and with AI support.

Contact

Get in touch

Book an appointment with us – or send us a message.

Kim Marius GräfeFrank MezlerLukas KleinBenjamin Kostrzewa

Personal and direct – with our founding team. Meet the founding team