Occupational safety software for companies with one or many sites
AMS Go is software for occupational safety in Germany: risk assessments, safety instruction, operating instructions, equipment checks, inspections and hazardous substances live in one system. You work in the browser and in the app for iOS and Android, and the software reminds you of deadlines and delivers evidence for audits and authorities.
- Web app and app for iOS and Android
- All modules in every plan
- Hosted in Germany
- Onboarding with data transfer
Everything you need – right in your browser
The complete AMS Go software as a web app: manage documents, coordinate tasks and control all modules conveniently from any computer – no installation required.
Central dashboard & overview
All important information at a glance: tasks, open items in the action plan and quick access to every feature.
Complete document management
Manage folder structures, upload and version documents and share them centrally – all in the web app.
Collaboration & administration
Manage users, organize departments and coordinate tasks in the action plan across teams.





An app that makes occupational safety simple and digital
Record and sync risk assessments, inspection reports and action plans with your smartphone.
PDF scanner & document management
Capture important documents on mobile, version them automatically and share them centrally.
Inspection reports & action plans
Tick off checklists live, add photos and assign actions directly to teams.
AI-powered occupational safety solutions
Use artificial intelligence to carry out risk assessments and inspections more efficiently and precisely. Our AI features significantly simplify your occupational safety processes.
From safety data sheet to operating instructions – in 2 minutes
What used to mean 1–2 hours of typing, looking things up and writing is done by AMS Go via drag & drop and AI. All you do is review and approve.
Drop data sheet
Drop safety data sheet here
PDF via drag & drop
AI extracts
- ProductWD-40® Multi-Use ProductSec. 1.1
- Signal wordDangerSec. 2.2
- PictogramsSec. 2.2
- Hazard statementsH222 · H229 · H304 · H336Sec. 2.1
- Storage class2B (aerosols)Sec. 15
- PPEGoggles, nitrile glovesSec. 8
AI creates instructions
Operating instructions
WD-40® Multi-Use Product (aerosol)
Hazards to people and the environment
- Extremely flammable aerosol, container may burst if heated
- May cause drowsiness or dizziness
Protective measures and rules of conduct
- Use only in well-ventilated areas, keep away from ignition sources
- Wear safety goggles and nitrile gloves
First aid
- If swallowed: do not induce vomiting, call a doctor immediately
- Wash skin with soap and water
Proper disposal
- Dispose of as hazardous waste (EWC 16 05 04)
* Example: 30 new or updated safety data sheets per year at 1–2 hours of manual effort per data sheet.
Key features:
- Prompt-based generation of hazard factors
- Situation descriptions and protective measures
- Selective transfer into the risk assessment
Example:
“Prompt: "hazards in the parking lot" → AI generates relevant hazard factors → you choose which ones to add to the risk assessment”
Key features:
- Automatic reading of safety data sheets
- Direct transfer into the system
- Source reference for every piece of information
- Verification of the information directly in the document
Example:
“Upload a safety data sheet → AI extracts all relevant information → you confirm the transfer → the system shows the sources”
Key features:
- Automatic generation of hazards and protective measures
- Smart selection of suitable warning, prohibition and mandatory signs
- Creation of rules of conduct and first aid measures
- Category-specific adaptation (hazardous substances, fire safety, etc.)
Example:
“Enter a description → choose a category → AI creates complete operating instructions → you review and confirm”
Transform your occupational safety with AI
Save valuable time when carrying out risk assessments and inspections. Our AI helps you identify risks and automatically suggests suitable protective measures.
Integration into your existing infrastructure
AMS Go integrates seamlessly into your existing IT infrastructure and offers flexible solutions for larger companies.
Hosting, encryption and DPA: security & data protectionPossible integrations
Examples of identity and storage providers AMS Go can be connected to. Your provider isn't listed? Talk to us.
Identity & single sign-on
Microsoft Entra ID
Keycloak
Okta
Auth0
Google Workspace
Storage & hosting
Amazon S3
Microsoft Azure
Google Cloud Storage
MinIO
Hetzner
OVHcloud
What the occupational safety software covers
Occupational safety software is only as good as the way its parts work together: an inspection turns into an action with a deadline, a safety data sheet into an entry in the hazardous substances register and an operating instruction, a risk assessment into training needs. These modules are available in AMS Go:
- Folder managementStructured management and organization of documents
- Risk assessmentsRecord and version them in a structured way and link them to actions
- Safety inspectionsMobile checklists, photo documentation and instant assignment
- Operating instructionsCreate, manage and make them accessible to employees digitally
- Action planCross-team tasks with priorities and responsibilities
- Hazardous substancesManagement of safety data sheets
- Visitor managementRegistration and management of visitors and contractors
- Training matrixPlanning and documentation of trainings and safety briefings
- Inspection registerOrganization of inspection intervals and inspection records
- OHS committee minutesEasy creation of meeting minutes
- Incident managementDeriving actions, statistics and KPIs
- Fire safetyOrganization of fire safety briefings and inspections
In progress: Legal register, PPE catalogue, Occupational health check-ups, Mandatory notices. All modules at a glance
Who the software is for
Management and plant managers
An overview of open actions, due checks and instruction per site – and evidence when the accident insurer or an authority asks.
Occupational safety specialists
Record inspections on mobile, maintain risk assessments and look after several companies or sites in one system.
Supervisors and safety representatives
Tasks, operating instructions and instruction for their own area in the app – without folders and spreadsheets.
Occupational safety software compared
Comparing several vendors? We put AMS Go next to other solutions – with sources, prices and the question of when which software fits better.
Frequently asked questions about occupational safety software
What is occupational safety software?
Occupational safety software – also called EHS software – brings the duties of occupational safety together in one system: risk assessments, operating instructions, safety instruction, inspection deadlines, site inspections, hazardous substances, actions and evidence. It reminds you of due dates and records who did what and when.
Is occupational safety software mandatory in Germany?
No. The German Occupational Safety and Health Act requires a suitable organisation (Section 3 (2) ArbSchG) but does not prescribe a tool. Software pays off as soon as deadlines, evidence and documents can no longer be managed reliably with Excel, Word and paper – at the latest with several sites or changing responsibilities.
What does the AMS Go occupational safety software cost?
The Unternehmermodell plan costs €80 per month (1 active user, up to 20 employees at the site), Professional €240 per month and site (1 to 50 employees per site), Enterprise €840 per month and site (51 to 350 employees per site); for more than 350 employees per site we prepare a custom offer. All modules and the app are included in every plan. See pricing
Is the occupational safety software also available as an app?
Yes. The mobile app for iOS and Android complements the web app: you record inspections, checks and photos on site, even without a network connection. Data is synchronised as soon as the device is back online. See the mobile app
How does the switch from Excel and folders work?
Our team transfers existing risk assessments, hazardous substances, operating instructions, users and training records from Excel, CSV, Word and PDF. A typical rollout takes four weeks per site. How onboarding works
Where is the data stored?
With IONOS in data centres in Germany, GDPR-compliant and with a data processing agreement. On-premise operation is possible on request. Security & data protection




