Installations subject to monitoring in Germany: inspection duties and approved bodies
Lifts, pressure vessels and installations in explosion hazard areas are subject to stricter inspection duties than other work equipment in Germany. Which installations are covered, who may inspect, which maximum intervals apply and when a permit is needed.
Last updated on 7 min readAMS Go editorial team
Key points at a glance
- Under Annex 2 of the Ordinance on Industrial Safety and Health (BetrSichV), installations subject to monitoring (überwachungsbedürftige Anlagen) are lift installations, pressure installations and installations in explosion hazard areas; in addition there are the installations requiring a permit under Section 18 BetrSichV, such as filling stations and storage facilities for more than 10,000 litres of flammable liquids.
- They are inspected before first commissioning, after modifications requiring inspection and at regular intervals – generally by an approved inspection body (zugelassene Überwachungsstelle, ZÜS), and by a person qualified to carry out inspections only where Annex 2 provides for it (Sections 15 and 16 BetrSichV).
- The maximum intervals are set out in Annex 2: lifts at least every two years with an intermediate inspection halfway, installations in explosion hazard areas at least every six years, pressure vessels subject to ZÜS inspection internally every five and for strength every ten years.
- Inspection records and certificates are kept at the place of operation for the entire period of use (Section 17 BetrSichV); defects found must be remedied within one year at the latest (Section 7 (3) ÜAnlG).
What are installations subject to monitoring?
Installations subject to monitoring are installations whose operation can pose considerable risks to employees and other persons and which are therefore designated as such by statutory ordinance (Section 2 No. 1 of the Act on Installations Subject to Monitoring, ÜAnlG). The Ordinance on Industrial Safety and Health (BetrSichV) lists them in Section 18 and Annex 2. They must be inspected before commissioning and at regular intervals – generally by an approved inspection body (ZÜS).
- Lift installations (Annex 2 Part 2): lifts under the Lifts Directive 2014/33/EU, construction site hoists, building maintenance units and paternoster lifts – but not escalators or storage and retrieval machines
- Pressure installations (Part 4): steam boiler installations, pressure vessel installations such as compressed air receivers, gas filling installations and piping for certain flammable, pyrophoric, acutely toxic or corrosive substances
- Installations in explosion hazard areas (Part 3): all work equipment relevant to explosion protection, including connecting elements and building parts, for example in paint shops or solvent stores
The duties do not only apply to employers: anyone who uses an installation subject to monitoring for commercial or business purposes is treated as an employer (Section 2 (3) BetrSichV).
ÜAnlG and BetrSichV: who regulates what
Since 16 July 2021, the Act on Installations Subject to Monitoring (ÜAnlG) has set out the basic duties of operators; previously they were part of the Product Safety Act. Under it, the operator must have the installation inspected before first commissioning, after modifications requiring inspection, after exceptional events and at regular intervals (Section 7 (1) ÜAnlG). An installation with defects that endanger employees or other persons must not be operated (Section 8 ÜAnlG).
Which installations are covered, how they are inspected and which intervals apply is laid down in the BetrSichV: Section 15 covers the inspection before commissioning, Section 16 the recurring inspection, Section 17 the records and Section 18 the permit requirement; Annex 2 contains the details for each type of installation. The employer specifies the inspection intervals in the risk assessment (Section 3 (6) BetrSichV).
Which inspections are required
- 1
Before first commissioning
The inspection checks whether technical documents such as the EC declaration of conformity are available and plausible and whether the installation, including its installation conditions, has been set up safely. The inspector also determines whether the specified inspection intervals are correct (Section 15 (1) and (2) BetrSichV).
- 2
After modifications requiring inspection
Any measure that affects safety can be a modification requiring inspection – including repairs (Section 2 (9) BetrSichV). The installation is inspected again before it is put back into service.
- 3
At regular intervals
At the intervals specified by the employer, without exceeding the maximum intervals in Annex 2 (Section 16 BetrSichV).
- 4
Extraordinary inspections
After exceptional events (Section 7 (1) ÜAnlG) and when the authority orders an inspection, for example after damage has occurred (Section 19 (5) BetrSichV).
Approved body or qualified person: who may inspect
As a rule, an approved inspection body such as TÜV or DEKRA carries out the inspection (Section 15 (3) BetrSichV). A person qualified to carry out inspections (zur Prüfung befähigte Person) may inspect where Annex 2 provides for it, after modifications that affect neither the design nor the mode of operation of the installation, and for mobile installations set up at a new location after first commissioning – except steam boiler installations requiring a permit.
- Lift installations: all inspections by the approved body
- Installations in explosion hazard areas: approved body or a qualified person with the special qualification under Annex 2 Part 3 No. 3.3; for gas filling installations, storage facilities, filling points, filling stations and airfield refuelling installations under Section 18 (1) Nos. 3 to 7 only the approved body
- Pressure installations: depending on pressure, volume and fluid according to Tables 2 to 11 in Annex 2 Part 4 – smaller vessels are inspected by a qualified person, larger ones by the approved body
Maximum intervals under Annex 2 BetrSichV
The employer specifies the actual inspection intervals, and the inspector checks at every inspection whether they are correct. These maximum intervals must not be exceeded (Section 3 (6) BetrSichV):
Lift installation: main inspection
Maximum interval2 years
InspectorApproved body (ZÜS)
Lift installation: intermediate inspection
Maximum intervalhalfway between two main inspections
InspectorApproved body (ZÜS)
Installation in explosion hazard areas: inspection for explosion safety
Maximum interval6 years
InspectorApproved body or qualified person under No. 3.3
Ex equipment, protective systems, safety, control and regulating devices
Maximum interval3 years
InspectorQualified person under No. 3.1
Ventilation systems, gas warning and inerting equipment in Ex areas
Maximum intervalevery year
InspectorQualified person under No. 3.1
Steam boilers (subject to ZÜS inspection)
Maximum intervalexternal inspection 1 year, internal 3 years, strength 9 years
InspectorApproved body (ZÜS)
Pressure vessels (subject to ZÜS inspection)
Maximum intervalexternal inspection 2 years (not required for unheated vessels), internal 5 years, strength 10 years
InspectorApproved body (ZÜS)
Pressure installation parts that qualified persons may inspect
Maximum interval10 years, strength test up to 15 years with proof
InspectorQualified person
Due dates are stated as month and year; a recurring inspection counts as on time if it takes place no later than two months after the due date (Section 14 (5), Section 16 (3) BetrSichV). For pressure installations, the inspection interval must be determined no later than six months after commissioning (Part 4 No. 5.4). The inspections of Ex equipment and of ventilation, gas warning and inerting equipment can be dropped if an equivalent maintenance concept is specified in the risk assessment (Part 3 No. 5.4).
Permit requirement under Section 18 BetrSichV
For some installations inspection is not enough: their construction, operation and any changes to design or mode of operation that affect safety require a permit from the competent authority. This applies to:
- steam boiler installations that fall into category IV under the Pressure Equipment Directive
- filling installations in which more than 10 kg of compressed gas per hour is filled into transportable pressure equipment for supply to others
- gas filling installations for refuelling vehicles with flammable gases
- storage facilities for more than 10,000 litres of flammable liquids
- filling points with more than 1,000 litres per hour, filling stations and airfield refuelling installations
For storage facilities, filling points and filling stations, flammable liquids with a flash point below 23 °C count. The application must include a test report from an approved body; the authority decides within three months, later in justified cases. The permit expires, among other things, if the installation has not been operated for three years (Section 18 (3), (5) and (6) BetrSichV).
Inspection certificate, record keeping and defects
If an approved body carries out the inspection, the employer must request an inspection certificate from it. Records and certificates must at least provide information on (Section 17 (1) BetrSichV):
- identification of the installation, date of inspection, type of inspection and basis of inspection
- scope of inspection and the suitability and functionality of the technical measures and suitability of the organisational measures
- result of the inspection and the intervals for the next recurring inspections
- name and signature of the inspector and, for inspections by an approved body, also the name of the body
The documents are kept at the place of operation for the entire period of use, electronic storage included. In every lift car, a marking such as an inspection sticker shows the month and year of the next inspection and the inspecting body (Section 17 (2)). Defects found must be remedied within a reasonable period, at the latest within one year (Section 7 (3) ÜAnlG). If the approved body finds a dangerous defect, the installation may only be put back into service after a follow-up inspection (Section 10 ÜAnlG).
Checklist: installations subject to monitoring
- All lifts, pressure installations and installations in explosion hazard areas recorded
- Permit requirement under Section 18 BetrSichV checked
- Inspection intervals specified in the risk assessment, maximum intervals observed
- Clarified for each inspection whether the approved body or a qualified person inspects
- Inspections before commissioning and after modifications requiring inspection planned
- Inspection certificates filed at the place of operation for the entire period of use
- Inspection sticker up to date in every lift car
- Defects tracked with deadlines, installations with dangerous defects taken out of service
- Accidents and cases of damage reported to the authority without delay
Free templates for this guide
As PDF and Excel, free – to use in your own company.
Frequently asked questions
What counts as an installation subject to monitoring?
Under Annex 2 BetrSichV: lift installations, pressure installations such as steam boilers, pressure vessels, filling installations and certain piping, and installations in explosion hazard areas. In addition there are the installations requiring a permit under Section 18 BetrSichV, such as filling stations and storage facilities for more than 10,000 litres of flammable liquids.
How often does a lift have to be inspected in Germany?
The main inspection by an approved body is due at least every two years, with an intermediate inspection halfway between, also by the approved body (Annex 2 Part 2 Nos. 4.1 and 4.3 BetrSichV). If the interval has been set too long, the employer must shorten it in agreement with the approved body. In addition, the operator regularly checks the lift for obvious defects.
Who may inspect installations subject to monitoring?
As a rule, an approved inspection body (Section 15 (3) BetrSichV). Qualified persons may inspect where Annex 2 provides for it – for example smaller pressure vessels, or installations in explosion hazard areas by specially qualified inspectors – and after modifications that affect neither design nor mode of operation. Lifts are always inspected by the approved body.
How long must inspection certificates be kept?
For the entire period of use of the installation, at the place of operation (Section 17 (1) BetrSichV). Electronic storage is permitted; the authority can request the documents at any time.
Terms from the glossary
This guide gives a general overview of German occupational safety law and does not replace legal advice. The regulations in force and the rules of the statutory accident insurance institutions are authoritative.
Organise occupational safety digitally
With the occupational safety software AMS Go you handle risk assessments, safety instructions, inspections and more in one system – mobile and with AI support.
Newsletter
Occupational safety, straight to your inbox
New templates, guides and changes to regulations – free from AMS Go. The newsletter is in German. You can unsubscribe at any time via the link in every email.
More guides
- Inspections
Inspection intervals for work equipment in Germany: overview, duties and records
8 minRead - Testing duties
Qualified person for inspections under TRBS 1203 in Germany: requirements, duties and appointment
6 minRead - Hazardous substances
Explosion protection document in Germany: contents, zoning and inspections
8 minRead