Scaffold inspection report template (PDF) for scaffold erectors and users
Two-part inspection report for working and protective scaffolds: inspection after erection or alteration by the erector's qualified inspector with release and tagging, visual inspection by the scaffold user and a log for daily checks.
As of PDFAMS Go editorial team
Free: sign up for the newsletter once and all templates are unlocked in this browser. You can unsubscribe at any time.
A scaffold is inspected before anyone works on it: after every erection or alteration, a person qualified to carry out inspections (zur Prüfung befähigte Person) inspects the scaffold (Section 14 (1) of the Ordinance on Industrial Safety and Health, BetrSichV, and TRBS 2121 Part 1). In addition, every employer whose employees use the scaffold has a qualified person visually inspect it before use (Section 4 (5) BetrSichV) – according to DGUV Information 201-011 at least every working day.
The template covers both steps: Part A with documents, stability, decking, side protection, access and tagging, plus a list of defects, release and handover. Part B with acceptance before first use, the points for every visual inspection and a log for the daily check.
What the template contains
- Part A: inspection report for the scaffold erector with 21 check points in four groups
- List of defects, release with restrictions of use and check of the six mandatory details on the tag
- Part B: acceptance and visual inspection by the scaffold user with 15 check points
- Log for daily checks with 18 rows and signature fields for both sides
How to use the template
- 1
Inspect after assembly
The erector's person qualified to carry out inspections completes Part A after every erection or alteration, has defects remedied, fixes the tag and hands the report and plan for use over to the user.
- 2
Accept before use
The scaffold user's qualified person compares the tag and plan for use with the planned activity and ticks off the points before first use. Employees are instructed in using the scaffold.
- 3
Check daily and keep the report
At least every working day, the qualified person walks the scaffold and enters the result in the log. If there are defects, the area is closed off and the erector notified. The report stays at the place of use, at least until the next inspection.
Legal basis
- Section 14 (1), (3) and (7) of the Ordinance on Industrial Safety and Health (BetrSichV): inspection after assembly and after exceptional events by a person qualified to carry out inspections, records kept at the place of use
- Section 4 (5) BetrSichV: check for obvious defects before each use
- Annex 1 nos. 3.1 and 3.2 BetrSichV: scaffolds – plan for erection, use and dismantling, stability, closure of unusable areas, supervision by a person with expert knowledge
- TRBS 2121 Part 1: risks to employees from falls when using scaffolds – tagging, visual inspection, inspections
- DGUV Information 201-011: use of working, protective and assembly scaffolds
Frequently asked questions
Who completes the scaffold inspection report?
Part A is completed by the person qualified to carry out inspections – usually the scaffold erector's, or your own company's if the scaffold is for your own employees. Part B is completed by the qualified person of each scaffold user. If several companies use the same scaffold, each checks it for its own employees or commissions a third party to do so (TRBS 2121 Part 1 no. 5.3).
How often must the scaffold user check the scaffold?
Before use – according to DGUV Information 201-011 at least every working day. After exceptional events such as storms, accidents or longer periods of non-use, a visual check is not enough: a person qualified to carry out inspections must then inspect the scaffold before further use (Section 14 (3) BetrSichV).
Where is the report kept?
At the place of use, at least until the next inspection (Section 14 (7) BetrSichV, TRBS 2121 Part 1 no. 5.6). DGUV Information 201-011 recommends fixing the inspection report, tag and plan for use together, protected from the weather, at the access stairs or ladder access. A copy in the site file or in digital form makes it easier to provide evidence.
You may use and adapt the template freely in your own company and for your own clients. It reflects the regulations named as they stand.
Never search a spreadsheet for a deadline again
In AMS Go, what this template covers lives in one system with reminders, history and records at the push of a button – mobile and with AI support.
Related guides
- Testing duties
Scaffold inspection in Germany: who inspects scaffolds, when and how under TRBS 2121
6 minRead - Testing duties
Qualified person for inspections under TRBS 1203 in Germany: requirements, duties and appointment
6 minRead - Testing duties
Fall protection equipment in Germany: selection, instruction and annual inspection
7 minRead - Organisation
Construction site health and safety coordinator and plan in Germany: client duties, prior notice and content
8 minRead
More templates
- Organisation
Construction health and safety plan template (PDF & Excel) under the German Construction Site Ordinance
PDF + ExcelFree download - Testing duties
Work equipment inspection register template (Excel) with inspection intervals
ExcelFree download - Testing duties
Forklift annual inspection report template (PDF) for industrial trucks
PDFFree download - Testing duties
Crane inspection report template (PDF & Excel) with register for lifting accessories
PDF + ExcelFree download




