AMS Go
Free template · Testing duties

Fall protection PPE inspection: checklist and inspection record (PDF & Excel) for the competent person

Inspection record for fall protection PPE inspected by a competent person (sachkundige Person): 30 check points for marking, full body harness, lanyard, energy absorber, retractable type fall arrester and karabiners, defect list, result and next date. Plus an Excel register that calculates the next inspection automatically.

As of PDF, Word and ExcelAMS Go editorial team

Free: sign up for the newsletter once and all templates are unlocked in this browser. You can unsubscribe at any time.

Fall protection PPE protects against fatal hazards – and ages through UV radiation, moisture, dirt and use. That is why users check it visually before each use, and the employer has it inspected by a competent person (sachkundige Person) as required, but at least every 12 months (DGUV Regel 112-198 No. 10.3, a rule of the German accident insurers). The manufacturer's instructions for use are decisive.

This checklist is the inspection record for exactly this inspection. It records the marking, date of manufacture and end of service life according to the manufacturer, guides you through harness, lanyard, energy absorber, retractable type fall arrester and karabiners, and documents defects, the result and the next date. For several items there is a collective list and an Excel register that calculates the next inspection.

What the template contains

  • PDF inspection record with master data: kind, manufacturer, serial or batch number, standard, date of manufacture, end of service life according to the manufacturer and date of first use
  • 30 check points in six groups rated “OK”, “Defect” or “N/A”: marking and documents, full body harness, lanyards, energy absorber, retractable type fall arrester, karabiners
  • Defect list with action, result, inspection label, next inspection date and signature of the competent person
  • Collective list for one inspection round with several items of equipment
  • Excel register of fall protection PPE with inspection interval, automatically calculated next inspection and drop-down lists for kind and result

How to use the template

  1. 1

    Record the equipment

    Give each component an inventory number and enter manufacturer, type, serial or batch number, date of manufacture and the manufacturer's information on the end of service life in the register. Keep the instructions for use with it – they determine what is inspected and how.

  2. 2

    Have it inspected by a competent person

    The competent person works through the check points for the component concerned and marks groups that do not apply as “N/A”. For retractable type fall arresters, manufacturers require an authorisation or special qualification; clarify beforehand who may inspect.

  3. 3

    Label the result and set the date

    Equipment with defects stays out of service until it has been repaired and released or withdrawn. Mark the inspection date or the next inspection date on the equipment, file the record with the documentation and enter the next date in the register.

Inspection register in AMS GoRecord fall protection PPE with its inspection interval, file inspection records with the equipment, get reminded of the next inspection in good time and pass defects to the action plan as actions.

Legal basis

  • DGUV Regel 112-198 “Benutzung von persönlichen Schutzausrüstungen gegen Absturz” (use of personal fall protection equipment) No. 10.3.2: inspection by a competent person as required, but at least every 12 months
  • DGUV Regel 112-198 No. 10.3.1: visual check by the users before each use
  • DGUV Regel 112-198 Nos. 8.1.7 and 8.9: withdrawal of equipment that is damaged or has arrested a fall; end of service life according to the manufacturer's information
  • DGUV Regel 112-198 Nos. 10.2 and 10.4: repairs only by competent persons authorised by the manufacturer; documentation of inspections (sample in Annex 3)
  • DGUV Grundsatz 312-906 on the qualification of persons for the competent inspection and assessment of personal fall protection equipment
  • Section 2(4) PPE Usage Ordinance (PSA-BV): through maintenance, repair, replacement and proper storage, the employer ensures that the PPE works well throughout its period of use

Frequently asked questions

How often must fall protection PPE be inspected in Germany?

Before each use, users check the equipment visually for proper condition and correct functioning (DGUV Regel 112-198 No. 10.3.1). In addition, the employer has it inspected by a competent person as required by the conditions of use and the circumstances in the company, but at least every 12 months (No. 10.3.2). Harsh conditions such as hot workplaces or changing users can require shorter intervals. After a fall or damage, the equipment may only be used again once a competent person has agreed.

Who may inspect fall protection PPE?

A competent person (sachkundige Person): someone who, through technical training and experience, has sufficient knowledge of fall protection PPE and is familiar enough with the regulations, the DGUV rules and the standards to assess its proper condition. Anyone who has successfully completed a course under DGUV Grundsatz 312-906 meets these requirements (DGUV Regel 112-198 No. 10.3.2). They do not have to be a “person qualified to carry out inspections” (zur Prüfung befähigte Person) under the Ordinance on Industrial Safety and Health (BetrSichV). For retractable type fall arresters, manufacturers require an authorisation or special qualification.

How long may a full body harness be used?

DGUV Regel 112-198 does not state a uniform maximum period. The manufacturer is decisive: it states the end-of-service-life date on the equipment, or marks it with the month and year of manufacture and gives all the information needed to determine the end of service life in the instructions for use (No. 8.9). Irrespective of this, equipment is withdrawn if the competent person no longer releases it because of its condition.

Does the inspection have to be documented?

Yes. Periodic inspections, maintenance and repairs must be documented for the equipment; the sample in Annex 3 of DGUV Regel 112-198 shows the essential content (No. 10.4). It is also recommended to mark the last inspection on the equipment – with the date of the last or the next inspection.

You may use and adapt the template freely in your own company and for your own clients. It reflects the regulations named as they stand.

Never search a spreadsheet for a deadline again

In AMS Go, what this template covers lives in one system with reminders, history and records at the push of a button – mobile and with AI support.

Contact

Get in touch

Book an appointment with us – or send us a message.

Kim Marius GräfeFrank MezlerLukas KleinBenjamin Kostrzewa

Personal and direct – with our founding team. Meet the founding team