Confined space work in Germany: hazards, entry permit and rescue
Tanks, silos, shafts and pits are among the most dangerous work locations in a company: oxygen deficiency, gases, engulfment. How to assess work in confined spaces, approve it in writing and prepare the rescue under German rules.
Last updated on 8 min readAMS Go editorial team
Key points at a glance
- For work in tanks, silos and confined spaces, DGUV Rule 113-004 (February 2019 edition) puts the duties under the Occupational Safety and Health Act and DGUV Regulation 1 into practice: a risk assessment comes first, and the protective measures are set out in an entry permit (Erlaubnisschein).
- Before work starts, the employer appoints a supervisor with authority to give instructions and at least one standby person (Sicherungsposten) who keeps constant contact with the people inside – a lone worker alarm system must not replace the standby person.
- Tanks are emptied, cleaned, isolated from inlets and outlets, ventilated and gas-tested by competent persons; below 17 vol% oxygen, work may only be done with self-contained breathing apparatus.
- Rescue equipment must generally be kept on site, rescue must be practised realistically at least once a year, and rescuers may only enter without self-contained breathing apparatus if dangerous concentrations of hazardous substances and oxygen deficiency are ruled out.
What are confined spaces and tanks?
Confined spaces and tanks are areas enclosed entirely or mostly by solid walls in which, because of the restricted space, poor air exchange or the substances and equipment inside, the hazards are significantly higher than at normal workplaces. That is the definition in DGUV Rule 113-004 “Tanks, silos and confined spaces – Part 1: Work in tanks, silos and confined spaces” (Behälter, Silos und enge Räume). What matters is not size alone but the particular hazard: a broom cupboard in normal use is not a confined space, whereas a weighbridge pit in which gases can collect is.
- Containers, tanks, reactors and vessels
- Silos and bunkers for bulk materials
- Shafts, ducts, pits, tank bunds and weighbridge pits
- Cavities in buildings and machines, box girders of bridges and cranes
- Hubs, rotor blades and spinners of wind turbines
Any presence in the space counts as work – walking in, climbing in, descending, and even leaning in through a manhole. Typical reasons are cleaning, inspection, servicing, repair and troubleshooting.
Typical hazards in confined spaces
Oxygen deficiency
Typical causesInert gases such as nitrogen from purging, fermentation and decay, substances or tank walls that bind oxygen, inadequate ventilation
Toxic gases and vapours
Typical causesResidues, stirred-up sludge, cleaning agents, welding fumes, substances from leaking pipes or isolations
Fire and explosion
Typical causesFlammable vapours, combustible dust that has been stirred up, oxygen enrichment, for example from leaking welding equipment
Engulfment, burial, drowning
Typical causesBulk material forming bridges or cavities, material flowing in, liquids
Mechanical and electrical hazards
Typical causesAgitators, screw conveyors, valves that open, falling parts; conductive surroundings with little freedom of movement
Other strains
Typical causesHeat or cold, falls, physical exertion, psychological strain from confinement, height and limited visibility
Which rules apply in Germany?
There is no specific law on confined spaces. The duties arise from several regulations that DGUV Rule 113-004 brings together for practical use. As a DGUV rule it does not carry a legal presumption of conformity, but it is regarded as a suitable guide for meeting the duties.
Sections 5 and 10 of the Occupational Safety and Health Act (ArbSchG)
What it requiresRisk assessment before the work; organise first aid, recovery and links to emergency services
Section 8 of DGUV Regulation 1
What it requiresSupervision by a reliable person familiar with the work when dangerous work is done jointly; additional personal protection when someone works alone
Section 25(3) of DGUV Regulation 1
What it requiresProvide rescue equipment and means of rescue transport
Hazardous Substances Ordinance (GefStoffV) Section 9(7) and Annex I no. 1.4
What it requiresSupervision or additional measures for lone working with hazardous substances; permit-to-work system with written instructions where there is a fire or explosion hazard
Sections 10(3) and 11(2) of the Ordinance on Industrial Safety and Health (BetrSichV)
What it requiresPermit systems for maintenance; rescue and anchorages for rescue equipment on work equipment
For wastewater facilities, DGUV Rules 103-003 and 103-004 also apply, and for handling transportable silos, DGUV Rule 113-005.
Risk assessments in AMS GoAssess work in tanks and confined spaces as a separate task, document protective measures and rescue arrangements and track open measures with deadlines in the action plan.Entry permit, supervisor and standby person
Before work starts, the responsible person – the employer or an appointed person – issues an entry permit that sets out all protective measures. The supervisor, the standby person and, where applicable, a contractor's responsible person confirm with their signature that they know the measures. A carefully completed permit is at the same time the risk assessment for this job at this point in time. After longer interruptions, for example the next day, or when the persons involved change, it is reissued or extended. Where conditions are always the same and the same effective measures apply, written operating instructions (Betriebsanweisung) can replace the permit.
- Supervisor: reliable, familiar with the work and authorised to give instructions; checks before the start and at appropriate intervals that the measures are being followed, and must be available at short notice
- Standby person: keeps constant contact with the people inside – usually by line of sight, otherwise via voice link, signal line or lone worker alarm – can summon help at any time and knows the rescue measures
- Person carrying out gas testing: has expertise in measuring devices, substances and the installation, for example under DGUV Principle 313-002
Protective measures before and during the work
Because of the high hazard potential, the first question is always whether entry can be avoided – for example with cleaning devices operated from outside or an inspection by camera. If someone has to go in, this sequence applies:
- 1
Empty and clean
Remove the contents without entry wherever possible, flush or steam out residues. Take into account fire and health hazards from cleaning agents.
- 2
Isolate
Effectively disconnect all pipes through which substances, gases, heat or pressure could enter – for example remove spool pieces and fit blank flanges, insert spectacle blinds, or close two valves with a bleed in between and secure them against opening.
- 3
Isolate energy
Disconnect all drives from every energy source and secure them against being switched back on; lockout-tagout systems have proven effective. Release stored energy, shut down filling and discharge equipment.
- 4
Ventilate
Ventilate with fresh air so that the whole space is flushed through – never with oxygen. Monitor the ventilation; if it fails, work must stop immediately.
- 5
Gas test and monitor
Measure competently at a representative point and document the results. During the work, a gas detector often monitors the atmosphere; for this, instructing the standby person is sufficient.
- 6
Define protective equipment and work equipment
Respiratory protection if dangerous concentrations are still possible; hand lamps only on safety extra-low voltage; no compressed gas cylinders inside the tank except for breathing apparatus and fire extinguishers.
Oxygen
Reference value under DGUV Rule 113-004Natural air contains 20.9 vol%; if readings differ, find the cause. Filter devices only if no hazard from oxygen deficiency can occur; below 17 vol% only with self-contained breathing apparatus
Flammable gases, vapours, dusts
Reference value under DGUV Rule 113-004An explosive atmosphere is considered prevented if the concentration stays permanently below 50% of the lower explosive limit
Toxic substances
Reference value under DGUV Rule 113-004Occupational exposure limits and other assessment benchmarks; set specific release and alarm thresholds in the risk assessment
Plan and practise the rescue
The employer whose staff work in the space is responsible for rescue. If several companies are involved, they agree on who carries out the rescue and record it, for example on the entry permit. Because minutes usually count, the equipment generally belongs at the entry point; keeping it centrally with the works fire brigade only makes sense if hazardous substances and oxygen deficiency are ruled out.
- Wear the rescue harness during the work and keep it connected to the rescue device wherever possible
- Provide anchor points for rescue lifting devices above the access opening and keep the opening clear
- Only descend on a fall arrest harness if the lift back up takes no more than five minutes
- Prepare a written rescue plan for complex situations and include external rescue services in drills
- If there is a fire risk, keep foam or water extinguishers ready – CO₂ and powder are generally unsuitable in confined spaces
Checklist: work in confined spaces
- Checked whether the work can be done without entry
- Risk assessment carried out for this job
- Supervisor and standby person appointed
- Entry permit issued and signed by everyone involved
- Tank emptied, cleaned and isolated from all pipes
- Drives and energy sources isolated and secured against switching on
- Ventilation set up, gas test done, continuous monitoring arranged
- Rescue equipment on site, rescue practised, emergency call arranged
- Everyone involved instructed, at least annually for recurring work
Free templates for this guide
As PDF and Excel, free – to use in your own company.
Frequently asked questions
Is an entry permit mandatory for confined spaces in Germany?
DGUV Rule 113-004 provides that a permit setting out the protective measures is issued before any work in tanks, silos and confined spaces. Only where conditions are always the same and the same effective measures apply can written operating instructions replace it. Where hazardous substances create a fire or explosion hazard, the Hazardous Substances Ordinance also requires a permit-to-work system with written instructions.
Who can act as standby person?
A reliable person with the necessary mental and physical abilities – including adequate hearing and eyesight, physical resilience, the ability to recognise hazards and knowledge of the protective equipment used. They must know the rescue measures and be able to summon help at any time.
How often must confined space rescue be practised?
Under DGUV Rule 113-004 at regular intervals, but at least once a year and under realistic conditions. If the rescue plan involves external rescue services, they take part in the drills. For regularly recurring work, instruction is also given at least once a year.
Who may carry out gas testing?
Only persons with expertise in the measuring devices, the substances to be measured and the conditions on site. This expertise can be acquired, for example, under DGUV Principle 313-002. For continuous monitoring with a gas detector during the work, instruction on operating the device and on what to do in the event of an alarm is sufficient.
This guide gives a general overview of German occupational safety law and does not replace legal advice. The regulations in force and the rules of the statutory accident insurance institutions are authoritative.
Organise occupational safety digitally
With the occupational safety software AMS Go you handle risk assessments, safety instructions, inspections and more in one system – mobile and with AI support.
Newsletter
Occupational safety, straight to your inbox
New templates, guides and changes to regulations – free from AMS Go. The newsletter is in German. You can unsubscribe at any time via the link in every email.
More guides
- Hazardous substances
Hazardous substances risk assessment in Germany: duties, TRGS 400 procedure and checklist
8 minRead - Protective measures
Lockout-tagout in Germany: isolating machinery safely for maintenance
7 minRead - Organisation
Contractor management in Germany: coordinating, briefing and documenting contractors
8 minRead - Risk assessment
Lone working in Germany: risk assessment, emergency calls and lone worker alarms
7 minRead